学习啦>创业指南>职场>个人简历下载>英文简历>

机械工程师英文简历模板

大富2分享

  英文简历是使用英文写的简历。英文简历(resume)并无固定不变的单一形式,应聘者完全可以根据个人的具体情况来确定采用何种形式,灵活设计。

  Resume

  Name: Graduates Employment Network

  Gender: Female

  Date of birth: 1972-02-16

  Mouth: Jiangsu

  The current city: Shanghai City

  Work experience: five years

  The current annual salary: 5-6 million yuan

  Mobile phone:

  Residential address:

  Self evaluation

  5 years working experience in mechanical design, by CET-6. Pro-E, familiar with AutoCAD, Solidworks and Office, familiar with the process, can be engaged in the design and development and project management.

  Job intention

  Target industry: Machinery / equipment / instrument / heavy industry, industrial automation, automobile and spare parts, petroleum / chemical / mineral / Geology

  Target position: Mechanical Engineer

  Expectations: Shanghai City

  Expected salary: salary welfare needs to fill, generally relatively safe negotiable

  Time: how long can the arrival of new jobs

  Work experience

  2007/07 XXX now

  Industry: Machinery / equipment / heavy industry

  Department of Mechanical Design Engineer

  Main responsibilities

  1 by the individuals responsible for project, master project schedule, assist business personnel to understand customer needs, design fixture, fixture, equipment modification and field surveying and mapping parts, including assembly drawing, part drawing, BOM list, assist purchasing staff.

  2 by the individuals responsible for project, master project schedule.

  3 customers are Shanghai GM, Shanghai Volkswagen, Shanghai Natiefu, Wuxi BOSCH, Wuhu United States, Kunshan and Hangzhou etc. universal Fuji.

  2003/06 2007/06: Shanghai Keepahead ultrasonic equipment Co., Ltd.

  Industry: Machinery / equipment / heavy industry

  Department of Mechanical Design Engineer

  Main responsibilities:

  1 responsible for the project, including equipment assembly and parts production drawings, outsourcing list, pipeline map, assist the purchasing staff to support business personnel, at the same time tracking solution occurs processing manufacturing and assembly debugging problems, and through customer acceptance, and write instructions, sometimes also translated the equipment specifications (export in the English translation).

  2 the design of automatic ultrasonic cleaning equipment automatic mechanical arm, through the tunnel drying equipment, automatic high pressure spray, ultrasonic cleaning, wind drying (with the netbelt) and other non-standard equipment.

  1998/10 2002/12: Suzhou hongly mould machinery Co. ltd.;

  Industry: Machinery / equipment / heavy industry

  Technical department technician

  Main responsibilities:

  The preparation process, and according to the 2D drawings of Singapore engineer design, using Cimtron three-dimensional modeling, and translation of faxes and E-mail. Our products are stainless steel mould of glass.

  Project experience

  2008/06 2008/07: body machining fixture

  Development tools: Pro-e, AutoCAD

  Project Description: the fixture fixture for machining workpiece machining center, to the workpiece through the lateral expansion clamping device and the fixing plate, cutting through the spring pin to locate the center hole, take through the length of axis elliptical groove turntable mechanism to realize workpiece.

  Responsibility description: responsible for the design of parts and assembly plans, production schedule, follow up the progress, solve the problems in the process of production and assembly.

  2007/12 2008/01: a hole position check out

  Development tools: Pro-e, AutoCAD

  Project Description: the detector used for detecting the position degree of casting hole, products will be placed on the bottom position through a pin to detect the position of the workpiece, the detection position of the other inclined hole made reference plate and pin assembly of the handheld, seized by CMM, if not in the tolerance range of customer requirements in (+ 0.03), need to adjust.

  Responsibility description: Design of parts and assembly plans, production schedule, track progress, solve problems, adjust the fixture to meet customer requirements in the tolerance range.

  2006/04 - 2006/06: automatic high-pressure spray, ultrasonic cleaning, wind drying equipment production line

  Development tools: AutoCAD

  Project Description: this production line is used for cleaning and drying of stamping aluminum, steel mesh belt through the motor drive transmission of the workpiece, the first workpiece feeding section, the first and the two or three position is medium pressure spray, fourth, five or six position is the high-pressure spray, through high pressure pump and high pressure spray system, air knife with seventh air compressor station the water cut is eighth station, tunnel oven, final workpiece material.

  Responsibilities: assist business personnel to understand customer needs, design and manufacture of the assembly and parts diagram, communication and electrical engineers, support the procurement staff, tracking the progress of solving the production problem, initial customer acceptance records of customer comments, until final acceptance by the customer.

  Education and training

  1994/09 1998/06: of Wuhan University of science and technology of metallurgical mechanical design and manufacturing automation degree

  Certificate

  1998/06 master's degree certificate

  1996/09 passed the university English six levels

  Language ability: English: good

    902307